    Environment & work safety

    Services to ensure a safe, sustainable and legally compliant work environment. Waste management, reuse, environmental plans and work preparations.

    Environment & work safety services

    delete_sweep

    Waste management plan

    Governing document for sorting, handling, storage and transport of waste – from both environmental and safety perspectives.

    ecoMeet legal requirements and reduce climate impact
    recycling

    Reuse list

    Documents materials that can be reused, sold or donated – strengthens the environmental profile and reduces costs.

    autorenewCircular construction production
    health_and_safety

    Work environment plan

    Legally required document describing how risks on the construction site should be prevented and managed for a safe work environment.

    verified_userLegal requirement for all construction projects
    park

    Environmental plan

    Gathers the project's environmental goals, routines and measures to reduce climate impact during construction and meet certification requirements.

    natureSustainable construction with structure
    engineering

    Work preparation

    Plans and prepares work tasks in a safe and controlled manner – from simple transport to complex lifts.

    checklistSafe and prepared work tasks

    Waste management plan

    The waste management plan describes how the project's waste should be sorted, handled, stored and transported – from both environmental and safety perspectives. The purpose is to meet legal requirements and reduce climate impact.

    descriptionContent

    • chevron_rightWaste types and sorting levels
    • chevron_rightTemporary storage locations and containers
    • chevron_rightTransport routes and safety requirements
    • chevron_rightResponsibility allocation between contractors and logistics function
    • chevron_rightProcedures for hazardous waste and reuse
    • chevron_rightReporting and follow-up of quantities
    • chevron_rightPotential flat-rate additions (e.g. weather compensation)

    buildUsage

    • chevron_rightDeveloped during establishment phase and updated continuously
    • chevron_rightAppendix for procurement and followed up during production
    • chevron_rightDigital documentation in Projsite with photo, weight and sorting code

    emoji_eventsBenefit

    • chevron_rightMeets legal requirements and reduces climate impact
    • chevron_rightReal-time statistics and invoicing basis
    • chevron_rightOrder and structure on the worksite

    Reuse list

    The reuse list documents materials that can be reused, sold or donated to new projects. The purpose is to reduce waste volumes, lower costs and contribute to circular construction production.

    descriptionContent

    • chevron_rightMaterial type and quantity
    • chevron_rightCondition and assessed reuse potential
    • chevron_rightStorage and location
    • chevron_rightPhoto / ID / labeling
    • chevron_rightProposed handling (reuse, sale, donation)
    • chevron_rightRecipient or destination
    • chevron_rightDate, responsible person and status

    buildUsage

    • chevron_rightCreated during demolition, disassembly or production start
    • chevron_rightUpdated continuously as materials are identified or handled
    • chevron_rightCan be photographed and registered directly in Projsite

    emoji_eventsBenefit

    • chevron_rightStrengthens environmental profile and reduces costs
    • chevron_rightEasy follow-up of reused materials
    • chevron_rightAppendix to environmental report and climate calculations

    Work environment plan

    The work environment plan is a legally required document describing how risks in the project should be prevented and managed. It applies to everyone on the construction site and complements the logistics plan.

    descriptionContent

    • chevron_rightProject information and responsible roles
    • chevron_rightIdentified risks and protective measures
    • chevron_rightProcedures for personal protective equipment (PPE)
    • chevron_rightSafety during lifts, transport and internal transport
    • chevron_rightEmergency preparedness
    • chevron_rightSafety rounds and follow-up
    • chevron_rightSignature fields for involved parties

    buildUsage

    • chevron_rightDeveloped before construction starts and updated when new risks arise
    • chevron_rightAll contractors must know the content before starting work
    • chevron_rightLinked to risk analyses and deviation reports in Projsite

    emoji_eventsBenefit

    • chevron_rightSafe and well-organized work environment
    • chevron_rightBetter traceability and follow-up
    • chevron_rightMeets legal requirements for all construction projects

    Environmental plan

    The environmental plan gathers the project's environmental goals, routines and measures to reduce climate impact during construction. It serves as a governing document for all contractors.

    descriptionContent

    • chevron_rightProject's overall environmental goals
    • chevron_rightTransport and fuel strategy
    • chevron_rightWaste management and reuse
    • chevron_rightHandling of chemicals and hazardous waste
    • chevron_rightNoise, dust and emissions
    • chevron_rightReporting, follow-up and environmental responsibility
    • chevron_rightRequirements from environmental certification systems (Miljöbyggnad, BREEAM, LEED)

    buildUsage

    • chevron_rightDeveloped during establishment phase and updated continuously
    • chevron_rightUsed during induction and environmental audits
    • chevron_rightCan be tracked digitally in Projsite (transport, waste, reuse)

    emoji_eventsBenefit

    • chevron_rightMeets legal and client requirements
    • chevron_rightEasier follow-up of climate goals and certifications
    • chevron_rightBetter overview and reporting

    Work preparation

    Work preparation is used to plan and prepare a work task in a safe, efficient and controlled manner. It ensures everyone knows what to do and what risks exist.

    descriptionContent

    • chevron_rightWork task and purpose
    • chevron_rightResponsible persons and participants
    • chevron_rightIdentified risks and protective measures
    • chevron_rightStep-by-step method description
    • chevron_rightTools, machinery and aids
    • chevron_rightCommunication and emergency measures
    • chevron_rightSignature fields for review

    buildUsage

    • chevron_rightDone before work starts and reviewed on site with all involved
    • chevron_rightSaved digitally in Projsite with mobile signing
    • chevron_rightUsed during induction, risk reviews and safety rounds

    emoji_eventsBenefit

    • chevron_rightSafe and prepared work tasks
    • chevron_rightDigital signing and traceability
    • chevron_rightCan be used for all types of work tasks