    Strategic planning and analysis services that lay the foundation for efficient construction logistics. From traffic analyses to detailed logistics plans and risk assessments.

    Planning & analysis services

    map

    Traffic management plan

    Traffic management plan that ensures safe and efficient traffic flows around the construction site. The plan regulates signage, barriers and temporary traffic measures.

    gavelRequired for building permits
    query_stats

    Logistics analysis

    Systematic review of the project's logistics conditions to identify risks, bottlenecks and improvement opportunities before production starts.

    trending_upPrevent delays and cost increases
    route

    Logistics plan

    Comprehensive plan that controls all logistics flows in the project – from deliveries and material handling to waste management and transport.

    timelineStructured logistics throughout the project
    grid_on

    Site layout (2D)

    Site disposition plan in 2D showing placement of cranes, cabins, storage areas, transport routes and safety zones on the construction site.

    visibilityClear overview for all stakeholders
    view_in_ar

    3D site layout

    Three-dimensional visualization of the site providing better understanding of logistics flows, crane reach and vertical space requirements.

    3d_rotationVisualize complex logistics scenarios
    view_timeline

    Phase plan

    Logistics plan divided into 5–6 phases adapted to the project stages: establishment, frame, sealing, interior, final phase and decommissioning.

    speedRight logistics in the right phase
    warning

    Risk analysis

    Identifies, assesses and manages risks related to logistics, work environment, production and coordination – before they lead to disruptions or accidents.

    shieldPrevent disruptions and accidents

    Traffic management plan

    A traffic management plan is required for work affecting traffic. We produce complete plans approved by the municipality and Transport Administration.

    descriptionContent

    • chevron_rightSignage plans and barrier drawings
    • chevron_rightTemporary traffic measures and detour routes
    • chevron_rightPedestrian and cyclist solutions
    • chevron_rightAdaptation to local traffic regulations

    buildUsage

    • chevron_rightFor building permit and land use applications
    • chevron_rightThroughout the construction phase for traffic safety
    • chevron_rightWhen changes are made to the work area

    emoji_eventsBenefit

    • chevron_rightEnsures regulatory compliance
    • chevron_rightMinimizes traffic disruptions
    • chevron_rightIncreases safety for all road users

    Logistics analysis

    A logistics analysis identifies the project's logistics challenges early and provides concrete action proposals to avoid problems during production.

    descriptionContent

    • chevron_rightAnalysis of transport routes and accessibility
    • chevron_rightEvaluation of storage areas and material flows
    • chevron_rightRisk assessment of logistics scenarios
    • chevron_rightCapacity calculations for crane lifts and deliveries

    buildUsage

    • chevron_rightEarly stage to support project planning
    • chevron_rightAs decision support for logistics strategy
    • chevron_rightWhen procuring logistics services

    emoji_eventsBenefit

    • chevron_rightReduced production disruptions
    • chevron_rightBetter decision support in early stages
    • chevron_rightCost savings through preventive measures

    Logistics plan

    The logistics plan is the governing document for all logistics activities in the project. It creates order and predictability for all stakeholders.

    descriptionContent

    • chevron_rightDelivery schedule and time slots
    • chevron_rightMaterial handling and storage strategy
    • chevron_rightWaste management and sorting routines
    • chevron_rightCommunication plan and responsibility allocation

    buildUsage

    • chevron_rightAs governing document throughout the project
    • chevron_rightDuring subcontractor onboarding and coordination meetings
    • chevron_rightFor follow-up and continuous improvement

    emoji_eventsBenefit

    • chevron_rightMore efficient logistics flows on site
    • chevron_rightClear responsibilities reduce conflicts
    • chevron_rightBetter environmental performance with planned waste management

    Risk analysis

    The risk analysis is used to identify, assess and manage risks related to logistics, work environment, production and coordination. It provides a shared picture of where problems can occur – before they do.

    descriptionContent

    • chevron_rightIdentified risks per activity (deliveries, storage, crane lifts, transport)
    • chevron_rightAssessment of probability and consequence
    • chevron_rightProposed measures and responsible persons
    • chevron_rightRisk levels before and after measures
    • chevron_rightFollow-up and dates for review

    buildUsage

    • chevron_rightDeveloped during planning or establishment phase
    • chevron_rightUpdated when work methods, areas or contractors change
    • chevron_rightUsed as basis for coordination meetings, safety rounds and work preparation

    emoji_eventsBenefit

    • chevron_rightReduces disruptions and accidents
    • chevron_rightShared risk overview for all stakeholders
    • chevron_rightFoundation for logistics plan and work environment plan