Deliveries & reception

    Templates and tools for efficient handling of deliveries and reception.

    description

    Delivery plan

    info

    Overview

    The delivery plan is a central tool for creating order in the project's material flows. It shows what is coming, when, how and by whom – and functions as a bridge between schedule, areas and staffing. The purpose is to avoid queues, double deliveries and conflicts between actors, while using logistics resources efficiently.

    list

    Content

    • check_circlePlanned deliveries per week or phase
    • check_circleMaterial type, supplier and contractor
    • check_circleTransport type (demanding lifts, carrying, unloading etc.)
    • check_circleDelivery window and unloading area
    • check_circlePossible needs for machinery or traffic guard
    • check_circleResponsible person and contact information
    settings

    Usage

    The delivery plan is established in consultation between site management, logistics manager and affected contractors. The plan is used continuously to coordinate areas, resources and times – often with weekly updates. In Projsite, the delivery plan can be placed directly in the calendar view, allowing all parties to see current status in real time.

    description

    Reception control

    info

    Overview

    Reception control ensures that all materials arriving at the construction site match the order and requirements. It is used to document deviations, damages or deficiencies and ensure that errors are handled directly – before the material is used. A systematic approach to reception saves both time and costs and strengthens the quality chain between supplier, subcontractor and construction management.

    list

    Content

    • check_circleDate, supplier and order number
    • check_circleMaterial type and quantity
    • check_circleControl of damages, marking and delivery documents
    • check_circleDeviation report and photo
    • check_circleSignatures from receiver and supplier
    settings

    Usage

    Reception control is performed for each delivery requiring control, especially for materials with high value, safety requirements or environmental impact. It can be done digitally via Projsite (with photo and note) or manually via the finished template. Recommended to be carried out by logistics resource, reception controller or respective subcontractor depending on the project's organization.

    description

    Carrying planning

    info

    Overview

    Carrying planning describes how materials should be transported within the building – from unloading area to assembly location. The purpose is to minimize risks, avoid congestion and ensure that the right resources are in the right place at the right time. A clear carrying plan is especially important in projects with many contractors, tight spaces or high material turnover.

    list

    Content

    • check_circleMaterial type and volume
    • check_circleTransport routes and floor plans
    • check_circleNeed for elevator, lift or internal transport machine
    • check_circleResponsibility distribution between subcontractor and logistics function
    • check_circleTimes for carrying and any permits
    • check_circleSpecial protective measures (floor protection, barriers etc.)
    settings

    Usage

    Carrying planning is developed before materials begin to be moved into the building. It is updated continuously when conditions change, e.g. with new contractors, changed transport routes or new interior logistics. The plan is used as a basis for logistics meetings, work preparations and risk analysis before heavy or awkward lifts. In Projsite, carrying activities can be planned directly in the calendar or linked to the delivery plan.

    description

    Cleaning routines

    info

    Overview

    The cleaning routines describe responsibility, frequency and method for cleaning common areas, logistics areas and temporary construction roads. The purpose is to maintain order, safety and work environment – and to avoid discussions about who should clean what. Clear cleaning routines are a basic prerequisite for functioning construction logistics and for a safe and efficient workplace.

    list

    Content

    • check_circleScope and responsibility (logistics, subcontractor, site management)
    • check_circleCleaning zones and division of areas
    • check_circleFrequency (daily, weekly, after completed work)
    • check_circleEquipment and waste management
    • check_circleRoutines for deviations and checkpoints
    • check_circleSignature list or follow-up table
    settings

    Usage

    Cleaning routines are developed in connection with establishment and apply throughout production time. The document is used for introductions, logistics meetings and safety rounds. When procuring subcontractors, the routines can be attached as an appendix to the logistics plan or general provisions, so that responsibility is clear from the start. In Projsite, cleaning activities can be added to the calendar and linked to recurring reminders.