Environment and safety

    Templates and tools for environmental management and safety at the construction site.

    description

    Waste management plan / Waste plan

    info

    Overview

    The waste management plan describes how the project's waste should be sorted, handled, stored and transported – both from an environmental and safety perspective. The purpose is to meet legal requirements, reduce climate impact and create order at the workplace. The plan is used as a governing document for all contractors and often forms the basis for statistics and follow-up.

    list

    Content

    • check_circleWaste types and sorting levels
    • check_circleTemporary storage locations and containers
    • check_circleTransport routes and safety requirements
    • check_circleResponsibility distribution between contractors and logistics function
    • check_circleRoutines for hazardous waste and recycling
    • check_circleReporting and follow-up of quantities
    • check_circlePossible standard additions (e.g. weather compensation)
    settings

    Usage

    The plan is developed in the establishment phase and updated when changes occur in material flows, contractors or storage areas. Used as an appendix in procurement and followed up continuously in production. In Projsite, all waste management can be documented digitally by machine operators, with photo, weight and sorting code directly in the app. The system can also generate statistics in real time and create basis for invoicing.

    description

    Recycling list

    info

    Overview

    The recycling list is used to document which materials can be reused, sold or donated to new projects. The purpose is to reduce the amount of waste, lower costs and create value from what would otherwise have been discarded. A structured recycling effort strengthens both the environmental profile and the economy – and shows concretely how the project contributes to circular construction production.

    list

    Content

    • check_circleMaterial type and quantity
    • check_circleCondition and assessed recycling potential
    • check_circleStorage and storage location
    • check_circlePhoto / ID / marking
    • check_circleProposed handling (recycling, sale, donation)
    • check_circleRecipient or destination
    • check_circleDate, responsible and status
    settings

    Usage

    The recycling list can be created in connection with demolition, dismantling or production start. It is updated continuously when new materials are identified or handled. In Projsite, materials can be photographed and registered directly in the system, making it easy to follow up what has been recycled or passed on to other projects. The list can also be used as an appendix to the environmental report or for climate calculations.

    description

    Environmental plan

    info

    Overview

    The environmental plan gathers the project's environmental goals, routines and measures to reduce climate impact during construction. It functions as a governing document for all contractors and should ensure that both legal requirements and client requirements are met. A clear environmental plan shows how the project handles transport, energy, waste, recycling and chemicals – and makes it easier to follow up both climate goals and environmental certifications.

    list

    Content

    • check_circleProject's overall environmental goals
    • check_circleTransport and fuel strategy
    • check_circleWaste management and recycling
    • check_circleHandling of chemicals and hazardous waste
    • check_circleNoise, dust and emissions
    • check_circleReporting, follow-up and environmental responsibility
    • check_circlePossible requirements from environmental certification systems (e.g. Miljöbyggnad, BREEAM, LEED)
    settings

    Usage

    The environmental plan is developed in the establishment phase and updated continuously during the project. It is used for introduction, follow-up and as a basis for environmental audits. In Projsite, several parts of the environmental plan can be followed up digitally – for example transport, waste and recycling – which provides both better overview and easier reporting.

    description

    Work environment plan

    info

    Overview

    The work environment plan is a statutory document that describes how risks in the project should be prevented and managed. It applies to everyone at the construction site and should ensure a safe, efficient and well-organized work environment. The plan complements the logistics plan and is used to show how work environment efforts are integrated into logistics – from deliveries to waste management.

    list

    Content

    • check_circleProject information and responsible roles
    • check_circleIdentified risks and protective measures
    • check_circleRoutines for personal protective equipment (PPE)
    • check_circleSafety during lifting, transport and carrying
    • check_circlePreparedness in case of accident and emergencies
    • check_circleSafety rounds and follow-up
    • check_circleSignature field for affected parties
    settings

    Usage

    The work environment plan must be developed before construction starts and updated as soon as new risks arise or work tasks change. All contractors must have access to the plan and know the content before they begin their work. In Projsite, the work environment plan can be linked to risk analyses, work preparations and daily deviation reports – which provides better traceability and follow-up.