Efficient construction logistics is crucial for success in both small and large projects.
Winter conditions increase the complexity of construction logistics with cold, snow and ice.
Construction projects require careful planning and resource management to stay on schedule.
Digitalization is shaping the future of construction logistics through new technologies.
Templates and tools for method descriptions and quality assurance.
Work preparation is used to plan and prepare a work task in a safe, efficient and controlled manner. It ensures that everyone in the work team knows what needs to be done, what risks exist and how they are managed. The general template can be used for all types of tasks – from simpler transports to more complex lifts or assemblies.
Work preparation should be done before work starts and reviewed with all involved on site. It can be saved digitally in Projsite, where participants sign directly in the mobile app. The document is also used for introduction of new employees, risk reviews and safety rounds.
This work preparation is used when planning carrying of materials within the building. The purpose is to avoid damage to personnel, building parts and materials and to ensure efficient flow in tight spaces.
Performed before carrying work begins, especially in projects with multiple contractors or limited areas. Can be complemented with Carrying Planning and linked to delivery plan in Projsite.
This work preparation is used for planning waste management, including sorting, lifting and transport of waste within the construction area. The purpose is to prevent injuries, spills and environmental risks and ensure proper handling of hazardous waste.
Performed before waste management starts or when new fractions are introduced. Can be linked directly to Projsite where machine operators log waste digitally with photo and weight.
This work preparation is used for crane lifts, where signalman, operator and other personnel need clear roles and communication. The purpose is to prevent accidents, crushing injuries and material damage through planned and controlled lifts.
The preparation should be performed before each new type of lift or changed conditions. Signed by crane operator and signalman and saved in the project's document management or in Projsite.
Used to plan work during traffic direction, temporary entrances and passage areas. The purpose is to prevent accidents, create safety for pedestrians and drivers and ensure that logistics flows are not disrupted.
Performed before traffic direction starts and updated when changes occur in traffic flows or road diversions. Can be used as a basis for coordination meetings and work environment reviews.
This work preparation is used when working with wheel loaders, telehandlers or other unloading machines. The purpose is to ensure safe procedures for driving, loading, barriers and communication at the construction site.
The preparation is developed before work with unloading machine begins or when new machines are used. Used for introduction, safety meetings and safety rounds. In Projsite, work preparation can be linked to the digital delivery plan, so that unloading is planned and documented in the same flow.