Planning & control

    Templates and tools for effective project planning and control.

    description

    Logistics plan

    info

    Overview

    The logistics plan describes how materials, waste, transportation and resources should flow through the project – from establishment to completion. The purpose is to create order, safety and efficiency at the construction site. A well-thought-out logistics plan reduces double handling, waiting times and environmental impact – and makes it easier for everyone to follow common rules. The logistics plan is often used as a basis in procurement of subcontractors. It can also replace the document General provisions – Logistics prerequisites in projects where you want to gather all rules and routines in one governing document. When changes occur during the project, it is the logistics plan that is updated.

    list

    Content

    • check_circleTransport routes and zone division
    • check_circleUnloading areas, storage areas and site establishment
    • check_circleDelivery routines and time windows
    • check_circleResponsibility distribution between contractors
    • check_circleWaste and recycling management
    • check_circleCommunication and contact channels
    settings

    Usage

    The logistics plan is developed in connection with establishment and updated continuously during the project. Used as a governing document for introductions, coordination meetings, procurement and follow-ups.

    description

    Logistics analysis

    info

    Overview

    The logistics analysis is used to identify risks, bottlenecks and improvement opportunities before production starts. It is the foundation for all decisions about flows, establishment, areas and resources. The analysis makes it possible to discover problems before they occur – and prioritize actions that have the greatest effect on time, safety and environment.

    list

    Content

    • check_circleReview of logistics prerequisites
    • check_circleIdentification of risks (e.g. narrow passages, delivery conflicts)
    • check_circleAssessment of areas, accessibility and storage capacity
    • check_circleRecommendations for transport flows and handling methods
    • check_circleBasis for logistics plan and time planning
    settings

    Usage

    Performed at an early stage, often in parallel with production planning or establishment drawings. Documented in the template and used as a basis for the finished logistics plan.

    description

    Logistics prerequisites (General provisions)

    info

    Overview

    This document gathers the project's basic rules and frameworks for construction logistics – what everyone at the workplace needs to know. The purpose is to create clarity, fairness and safety in daily work. Think of it as construction logistics' "rules of the game".

    list

    Content

    • check_circleOpening hours and delivery windows
    • check_circleTraffic rules, entrances and parking
    • check_circleRequirements for notification and ID06
    • check_circleOrder, cleaning and waste
    • check_circleResponsibility distribution between contractors
    • check_circleEnvironmental requirements and sustainability routines
    • check_circleContact information for logistics function
    settings

    Usage

    The document is sometimes used already in procurement of subcontractors to clarify the construction logistics rules. In some projects it is replaced by a more comprehensive Logistics Plan – especially when the logistics function is active throughout production. If only one of these documents is used, it should always be the one called Logistics Plan, as it can be updated continuously. The document is developed in the establishment phase and distributed to all contractors at project start. Updated as needed and used for introductions and coordination meetings.

    description

    Risk analysis

    info

    Overview

    The risk analysis is used to identify, assess and manage risks related to logistics, work environment, production and coordination. It provides a common picture of where problems can occur – before they do – and ensures that everyone involved works from the same conditions. A well-conducted risk analysis reduces disruptions, accidents and unnecessary costs, and is used as a basis in both logistics plan and work environment plan.

    list

    Content

    • check_circleIdentified risks per activity (e.g. deliveries, storage, crane lifts, transport)
    • check_circleAssessment of probability and consequence
    • check_circleProposed measures and responsible persons
    • check_circleRisk levels before and after action
    • check_circleFollow-up and control date
    settings

    Usage

    The risk analysis is developed in the planning or establishment phase, and updated when changes occur in work methods, areas or contractors. Used as a basis for coordination meetings, safety rounds and before major activities requiring work preparation.

    description

    Logistics and coordination meeting minutes

    info

    Overview

    The minutes are used at recurring logistics and coordination meetings between site management, subcontractors and logistics function. The purpose is to create structure, responsibility distribution and follow-up on issues related to flows, areas, deliveries, safety and environment. It functions as central documentation of what has been decided and who is responsible for what – and complements the logistics plan in daily management.

    list

    Content

    • check_circleDate, meeting leader and participants
    • check_circlePrevious meeting points / actions
    • check_circleNew points (deliveries, areas, temporary closures, waste, recycling, safety)
    • check_circleDecisions, responsible person and deadline
    • check_circleOther questions and next meeting date
    settings

    Usage

    The minutes are used continuously during production, often every week or every other week. It is saved in the project's common document management or directly in Projsite for full transparency and history. Used as a basis for follow-ups, logistics audits and coordination reviews.